Skip to main content

VC Summer

Go Search
  

WELCOME TO VC SUMMER'S Spring 2011 OUTAGE

INFO ABOUT THE FALL 2011 VC SUMMER OUTAGE.

Picture       Picture       

THE VC SUMMER OUTAGE SHUT DOWN DATE IS APRIL 16TH. IT IS SCHEDULED FOR 35 DAYS AT THIS TIME. THE MAIN REPORT DATE WILL BE SATURDAY, APRIL 9TH AT 0700.  PLEASE REPORT TO THE NUCLEAR TRAINING FACALITY. YOU WILL NEED APPROPIATE CLOTHING FOR INPROCESSING, NO SHORTS AND OR TANK TOPS.
 
KEN POLATTY IS THE SITE MANAGER, 803-345-4360, AND CHRIS CUMALANDER WILL AGAIN BE THE SITE COORDINATOR FOR THE OUTAGE.    
 
REPORTING INFORMATION
0700 IS THE REPORT TIME ON THE DAY OF YOUR REPORT DATE.  PLEASE REFER TO THE REPORT DATE GIVEN TO YOU BY THE HOME OFFICE RECRUITERS.
 
ON YOUR FIRST DAY PLEASE REPORT TO THE NUCLEAR TRAINING FACILITY FOR IN-PROCESSING. BUILDING.
 
PLEASE BRING PROOF OF YOUR LATEST PHYSICAL.
 
 
WHAT YOU WILL NEED WHEN YOU SHOW UP ON SITE
A VALID DRIVERS LICENSE AND YOUR SOCIAL SECURITY CARD.  A PASSPORT WILL NOT DO.  THIS AN FPL STIPULATION, PLEASE BE PREPARED.
 
PLEASE ADHERE TO THE PERSONNEL DRESS POLICY, WHICH REQUIRES US TO WEAR FULL-LENGTH PANTS, SLEEVED SHIRTS WITH NO OFFENSIVE LAUNGAUAGE OR SYMBOLS.
NUF EXAM
THE NUF EXAM IS GOOD FOR 5 YEARS AT VC SUMMER.  IF YOU KNOW YOU NEED TO TAKE IT PLEASE NOTIFY US SOON AS YOU CAN.  STUDY MATERIAL CAN BE MADE AVAILABLE TO YOU IF NEEDED.  A PASSING GRADE OF 80% OR BETTER IS REQUIRED.  JR HP's only need to make 70% or greater.
PPE / SCRUBS
EVERYONE IS EXPECTED TO WEAR ANSI Z75 STEEL TOE SHOES INSIDE THE POWER BLOCK.
 
PLEASE BRING YOUR HARDHAT FROM YOUR LAST JOB ASSIGNMENT IF POSSIBLE.
BANKING INFO
There are Bank of America's in the area that will cash your checks.
MISCELLANEOUS NOTES
Please feel free to call Sam Bass at 800 225 0385, ext. 1233 or KEN POLATTY at 803 345 4360 for other concerns or information about the outage.

 ‭(Hidden)‬ Admin Links