|
|
|
12/10/2008
INFO ABOUT THE SPRING 2012 TURKEY POINT OUTAGE.

THE TURKEY POINT OUTAGE SHUT DOWN DATE IS Jan. 30th. IT IS SCHEDULED FOR 168 DAYS AT THIS TIME. REPORTS DATES are 1/11 and 1/16. Check with recruiting for your actual start date. Report to the inprocessing complex on the back side of the training complex. On reprts dates of 1/11 and 1/16 report at 3pm. Training / In Processing week is held at night 3pm to 12am. YOU WILL NEED APPROPIATE CLOTHING FOR INPROCESSING, NO SHORTS AND OR TANK TOPS.
Dale Pittman WILL BE THE SITE MANAGER FOR THE OUTAGE. CELL # 352 212 6846
5/21/2008
15:00, 3PM IS THE REPORT TIME ON THE DAY OF YOUR REPORT DATE. PLEASE REFER TO THE REPORT DATE GIVEN TO YOU BY THE HOME OFFICE RECRUITERS.
ON YOUR FIRST DAY PLEASE REPORT TO THE In processing building behind the training center.
A VALID DRIVERS LICENSE AND YOUR SOCIAL SECURITY CARD. A PASSPORT WILL NOT DO. THIS AN FPL STIPULATION, PLEASE BE PREPARED.
PLEASE ADHERE TO THE PERSONNEL DRESS POLICY, WHICH REQUIRES US TO WEAR FULL-LENGTH PANTS, SLEEVED SHIRTS WITH NO OFFENSIVE LAUNGAUAGE OR SYMBOLS.
THE NUF EXAM IS GOOD FOR 5 YEARS AT TURKEY POINT. IF YOU KNOW YOU NEED TO TAKE IT PLEASE NOTIFY US SOON AS YOU CAN. STUDY MATERIAL CAN BE MADE AVAILABLE TO YOU IF NEEDED. A PASSING GRADE OF 80% OR BETTER IS REQUIRED.
EVERYONE IS EXPECTED TO WEAR ANSI Z75 STEEL TOE SHOES INSIDE THE POWER BLOCK.
OREX SCRUBS ARE PROVIDED FOR YOU AT TURKEY POINT. NOTE THESE OREX SCRUBS ARE NOT ALLOWED OUTSIDE RCA.
PLEASE BRING YOUR HARDHAT FROM YOUR LAST JOB ASSIGNMENT IF POSSIBLE.
There are Bank of America's in the area that will cash your checks.
Please feel free to call Sam Bass at 800 225 0385, ext. 1233.
|
|
|
|
|
|