Skip to main content

Shearon Harris

Go Search
  

Harris Plant Fall 2010

We would like to thank you for choosing to work for Bartlett Nuclear Inc. at the upcoming Fall ’10 RFO at Progress Energy’s Shearon Harris Nuclear Power Plant.  The outage is scheduled to start on 10/1/10 and last for approximately 4-5 weeks.  Please review the following information and if you have any questions or concerns, or run into any problems prior to reporting, do not hesitate to contact either the Bartlett home office or the Shearon Harris office.

Contact Info

HP/Decon Coordinator:      Darryl Clark

Phone:                                              (919)-362-2173/ (919)-215-2908 Cell

e-mail:                                               Darryl.clark@pgnmail.com      

Admin Coordinator:                             Cathy Edge

Phone:                                                    (919) 362-3459 / (919) 618-2530 Cell

Bartlett office:                    1(800)225-0385 Ext. 1272 for Joey, or Ext. 1259 for Kelli

Misc. Requirements

Bring your Bartlett hard hat with you.  

 

Leather work shoes with ½ inch soles are required.  (sneakers/tennis shoes are not allowed)

 

Collared shirts are required. (T-shirts/Tank tops are not allowed)

 

Jackets, hats, or clothing of any sort with emblems, logos or wording other than the contractor or utility logo are not allowed.

 

Blue Jeans are not allowed.  Any other color denim is acceptable.

 

Bring two forms of ID, at least one of which should be a picture ID, (i.e. social security card and valid driver’s license)  Make sure the ID you bring is current and NOT EXPIRED.

 

Bring lifetime exposure records. (Form 4 or written estimate from last job will suffice)

Prohibited items

All vehicles will be searched.  Take the time to check your vehicle for prohibited items before coming to site. This includes but is not limited to empty beer and liquor containers, firearms, illegal drugs or paraphernalia. 

If in doubt, don’t bring it to site

 

Weapons of any kind are not allowed on site property (including parking areas) and will be confiscated.

HP Testing

The NUF Exam is good for 5 years if passed with an 80% or better and you have not had a break in the nuclear industry longer than 1 1/2 years.  NRRPT certification will exempt SHP’s from having to take the exam as long as they are current on the quals and active.  JHP’s do have to take and pass the NUF exam with an 80%.

 If you need study material you may go to www.westrain.org or www.nukeworker.com. 

Directions

On your first day, you will be expected to arrive at the Progress Energy Harris Visitors Center at 7am, also known as the HEEC.  This building is located on New Hill Holleman Road which you will access from US Hwy 1, exit 89 (approximately one mile off of the exit).  If you are arriving from the North, you will take a left hand turn off of the exit; from the south, a right hand turn. You will need to park in the available parking on the backside of the HEEC and enter through the side of the building (follow signs that direct you towards In-Processing).  From there you will report to Auditorium “B” which is located just past the receptionist’s desk / lobby area back on the right.  Orientation will be provided here by our Bartlett / Harris Site management staff identified below.  During your time in orientation, we will interface with Progress Energy In-Processing and Training personnel to complete any badge and training needs.  Our goal is to get you unescorted access to the site and have you fully qualified and trained within the first two days of your arrival.

Directions to Shearon Harris
Shearon Harris Site Map
Site Map
Lodging
 
 
 
 

From: Barbara Brinkley

Sent: Friday, January 06, 2012 3:38 PM
Subject: Candlewood Suites - Raleigh - Cary

 

Thank you for assisting me with getting my information out concerning the 2012 Outage. The rate will be $51 and I have attached information for your review. Thank you!

http://www.ichotelsgroup.com/candlewood/hotels/us/en/raleigh/rducw/hoteldetail 

 

Barbara

Campgrounds
Jordan Dam RV Park
Location 10 minuets from the Harris Plant
US 1 Moncure  Web site www.jordandamrvpark.com
Phone # (919)770-6890 
 

70 E Mobil Park                                                                                                    (919) 772-6568

College Park Campground                                                                                  (919) 231-8710

Cooper’s Mobile Park                                                                                         (919) 772-6966 / (919) 868-4896

Deep River Campground                                                                                    (336) 629-4069

Fall’s Lake State Park                                                                                          (919) 676-1027

Holiday Travel Park                                                                                             (919) 934-3181

Mark Goodwin                                                                                                      (919) 542-6818 / (919) 868-0973       

Misc

 ‭(Hidden)‬ Admin Links