6/14/2010
We would like to thank you for choosing to work for Bartlett Nuclear Inc. at the upcoming Fall ’10 RFO at Progress Energy’s Shearon Harris Nuclear Power Plant. The outage is scheduled to start on 10/1/10 and last for approximately 4-5 weeks. Please review the following information and if you have any questions or concerns, or run into any problems prior to reporting, do not hesitate to contact either the Bartlett home office or the Shearon Harris office. 11/24/2008
HP/Decon Coordinator: Darryl Clark
Phone: (919)-362-2173/ (919)-215-2908 Cell
e-mail: Darryl.clark@pgnmail.com
Admin Coordinator: Cathy Edge
Phone: (919) 362-3459 / (919) 618-2530 Cell
Bartlett office: 1(800)225-0385 Ext. 1272 for Joey, or Ext. 1259 for Kelli
Bring your Bartlett hard hat with you.
Leather work shoes with ½ inch soles are required. (sneakers/tennis shoes are not allowed)
Collared shirts are required. (T-shirts/Tank tops are not allowed)
Jackets, hats, or clothing of any sort with emblems, logos or wording other than the contractor or utility logo are not allowed.
Blue Jeans are not allowed. Any other color denim is acceptable.
Bring two forms of ID, at least one of which should be a picture ID, (i.e. social security card and valid driver’s license) Make sure the ID you bring is current and NOT EXPIRED.
Bring lifetime exposure records. (Form 4 or written estimate from last job will suffice)
All vehicles will be searched. Take the time to check your vehicle for prohibited items before coming to site. This includes but is not limited to empty beer and liquor containers, firearms, illegal drugs or paraphernalia.
If in doubt, don’t bring it to site
Weapons of any kind are not allowed on site property (including parking areas) and will be confiscated.
The NUF Exam is good for 5 years if passed with an 80% or better and you have not had a break in the nuclear industry longer than 1 1/2 years. NRRPT certification will exempt SHP’s from having to take the exam as long as they are current on the quals and active. JHP’s do have to take and pass the NUF exam with an 80%.
If you need study material you may go to www.westrain.org or www.nukeworker.com.
On your first day, you will be expected to arrive at the Progress Energy Harris Visitors Center at 7am, also known as the HEEC. This building is located on New Hill Holleman Road which you will access from US Hwy 1, exit 89 (approximately one mile off of the exit). If you are arriving from the North, you will take a left hand turn off of the exit; from the south, a right hand turn. You will need to park in the available parking on the backside of the HEEC and enter through the side of the building (follow signs that direct you towards In-Processing). From there you will report to Auditorium “B” which is located just past the receptionist’s desk / lobby area back on the right. Orientation will be provided here by our Bartlett / Harris Site management staff identified below. During your time in orientation, we will interface with Progress Energy In-Processing and Training personnel to complete any badge and training needs. Our goal is to get you unescorted access to the site and have you fully qualified and trained within the first two days of your arrival.

Jordan Dam RV Park
Location 10 minuets from the Harris Plant
Phone # (919)770-6890
70 E Mobil Park (919) 772-6568
College Park Campground (919) 231-8710
Cooper’s Mobile Park (919) 772-6966 / (919) 868-4896
Deep River Campground (336) 629-4069
Fall’s Lake State Park (919) 676-1027
Holiday Travel Park (919) 934-3181
Mark Goodwin (919) 542-6818 / (919) 868-0973
|
|
|
|
|
|
|
|
 |
 |
 |
 |
|