INFO ABOUT THE FALL 2011 POINT
BEACH OUTAGE
IMPORTANT: Plant Direction change.
Go about 10 miles north of Two Rivers on route 42.
While travelling north continue past Nuclear and Tapawingo Roads, as speed limit changes from 55 mph to 50 mph, (You will notice there are two street lights as you approach the next intersection) turn right on Two Creeks Road. Go ~ ¾ mile and turn right on Lakeshore Drive.
As you enter the site property there is a contractor parking lot to the left. After parking board a shuttle bus to take you to the South Gate/ Training Building.
All personnel arriving at Point Beach on 9/19/11 are to report to the Energy Information Center at 00700 CDT.
TO VIEW THE HELP BLOG
SITE .PLACES TO STAY
EAT,MAPS,RECREATION,
TRAVEL HELP,ETC.ETC.
GO TO THE TOP LEFT BOX ON THIS PAGE AND
DOUBLE CLICK ON "POINT BEACH WEB SITE".
PPE correction: Please wear a sturdy
upper leather ANSI Z75 steal toe shoe.
No atheltic type shoes are allowed.
THE POINT BEACH OUTAGE SHUT DOWN DATE IS October 3rd. IT IS SCHEDULED FOR 68 days, however for most technicians it will be about a 35 -50 day outage. THE MAIN REPORT DATES WILL BE September 19th and September 26th. CHECK WITH YOUR RECRUITER FOR YOUR ACTUAL START DATE.